Perform structural steel modifications to accommodate new 180ton chiller. Structural upgrades were done while the existing chiller was still in position to allow for one specialized lift. This substantially reduced operational impacts to the resort during the replacement project. Upgraded chiller electrical feed from the main distribution. Construct a new chilled water system to feed existing AHUs and allow for substantial future expansion.
➤Highlights
First Trane ACX Heat-Pump Chiller Installed in Canada
First R-454B Chiller to be Installed by AK Brown
AK Brown Refined the Chilled Water System to Allow for Future Expansion
Dual Pick Required to Meet Strict Bridge Access Limits
Limited Space Required Very Thoughtful and Precise Installation
Custom Fabricated Access Door to Accommodate Chiller Servicing
Concerned About Building Waste? We are too.
We have one the largest in-house recycling facilities, which is unrivalled in the industry. Meaning we do a lot of recycling ourselves. Not only that, all our construction material, office paper, cardboard, wood, metal, refrigerant, and oil is recycled. We educate all our clients on both waste reduction and energy management. Together, we can do our part.
WHY CHOOSE A K BROWN
WHY CHOOSE
A K BROWN
➤ DETAIL ORIENTED
Our technicians always show up on time, with the right tools, and stay until we are positive the job is done right.
➤ THE BEST TECHNOLOGY
We use the newest, high-efficiency equipment that is good for the environment and your building.
➤ 24/7 SERVICE
We never want customers to be without their building services, that is why we are always available, 24/7.
➤ EXCEPTIONAL SERVICE
We care about giving our customers the best service and products to ensure their commercial property runs smoothly.