Heninger Toyota Co-Gen Plant

AK Brown is proudly partnered with EC Power to offer our clients competitive factory support and pricing on these advanced CHP systems. EC Power's proven packaged CHP systems are configurable to many different applications and have industry-leading service intervals of 4000 run hours.

Heninger Toyota CHP

➤  Project Scope

AK Brown's exceptional design support and precision installation capabilities were instrumental in the project's success. We had the privilege of being involved in every project phase, which allowed us to enhance our Distech Controls strategy to refine the overall operating strategy. Ultimately, our efforts not only benefitted the client but also the environment.

➤Benefits

  • 120KW of Electricity Production
  • 1000MBH Heating Capacity
  • Full Peak Shaving Capabilities
  • Distech EMCS Integration
  • Modular Construction
Buildings don’t stop, so why should we? Our repair and maintenance teams are available 24-7 for all your emergency needs. Contact us today.

Concerned About Building Waste? We are too.

We have one the largest in-house recycling facilities, which is unrivalled in the industry. Meaning we do a lot of recycling ourselves. Not only that, all our construction material, office paper, cardboard, wood, metal, refrigerant, and oil is recycled. We educate all our clients on both waste reduction and energy management. Together, we can do our part.

WHY CHOOSE A K BROWN 

WHY CHOOSE A K BROWN

➤  DETAIL ORIENTED

Our technicians always show up on time, with the right tools, and stay until we are positive the job is done right.

➤  THE BEST TECHNOLOGY

We use the newest, high-efficiency equipment that is good for the environment and your building.

➤  24/7 SERVICE

We never want customers to be without their building services, that is why we are always available, 24/7.

➤  EXCEPTIONAL SERVICE

We care about giving our customers the best service and products to ensure their commercial property runs smoothly. 
Share by: